EXSHINE Nomor bagian: | EX-29-100 GRN |
---|---|
Pabrikan Nomor bagian: | 29-100 GRN |
Pabrikan / Merek: | Grayhill, Inc. |
Deskripsi singkat: | PUSH POST |
Memimpin Status Bebas / Status RoHS: | Memimpin bebas / RoHS Compliant |
Kondisi: | New and unused, Original |
Datasheet Unduh: | 29 Series Push Posts Datasheet |
Aplikasi: | - |
Bobot: | - |
Penggantian Alternatif: | - |
tegangan Penilaian | 120V |
---|---|
Mengetik | Standard |
penghentian Thread | 8-32 |
Penghentian | Threaded and Turret |
Seri | 29 |
Plating - Tubuh | Nickel |
panel Tebal | - |
Nama lain | 29-100 GRN-ND GH7670 |
Nut Plating | Nickel |
Nut Bahan | Brass |
Tingkat Sensitivitas Kelembaban (MSL) | 1 (Unlimited) |
Bahan - Isolasi | - |
Bahan - Tubuh | Brass |
Manufacturer Standard Lead Time | 8 Weeks |
Nomor Bagian Produsen | 29-100 GRN |
Gaya kepala | Smooth, Spring Loaded |
Ukuran kepala | 0.250" OD (6.35mm) |
Deskripsi yang Diperluas | Binding Post Connector Standard Smooth, Spring Loaded Green Nickel |
Deskripsi | PUSH POST |
Peringkat saat ini | 20A |
Lintas Lubang Diameter | - |
Warna | Green |
Nama lain | 29-100 GRN-ND GH7670 |
---|---|
Paket standar | 1 |
|
T / T (Transfer Bank) Menerima: 1-4 hari. |
|
Paypal Menerima: segera. |
|
Serikat barat Menerima: 1-2 jam. |
|
MoneyGram Menerima: 1-2 jam. |
|
Alipay Menerima: segera. |
DHL EXPRESS Waktu pengiriman: 1-3 hari. |
|
FEDEX EXPRESS Waktu pengiriman: 1-3 hari. |
|
UPS EXPRESS Waktu pengiriman: 2-4 hari. |
|
TNT EXPRESS Waktu pengiriman: 3-6 hari. |
|
EMS EXPRESS Waktu pengiriman: 7-10 hari. |
- Greenlee adalah sumber terpercaya dan tepercaya untuk alat kelas profesional saat memasang kawat dan kabel. Dari holemaking dan membungkuk untuk menguji dan pengukuran, Anda dapat bergantung pada alat Greenlee untuk hidup lebih lama dr dan mengungguli persaingan setiap saat.